Creating custom dashboards

This section describes the process of creating a set of custom visualizations using the Wazuh dashboard component. We also show how to add individually created visualizations together to create a custom dashboard.

Visualizing the data

Data visualization enhances the ability to comprehend complex security data by providing a visual representation. This representation reveals patterns, trends, anomalies, and insights. This simplifies the interpretation of large datasets and makes it easier to identify security threats, assess the overall state of security, and make informed decisions.

There are different visualization techniques that can help make data clear and appealing. These visuals can be saved, combined for dashboards, and shared with others using the Wazuh dashboard.

We will cover the practical aspect of dashboard creation by creating different types of visualizations in the Wazuh dashboard and then integrating the visualizations to create a custom dashboard.

Creating visualizations

To create a visualization, click the upper-left menu icon and navigate to Explore > Visualize. This action will open a page where a list of visualizations is displayed if any have already been created. If not, the page will display a Create new visualization button.

Create new visualization

Click on Create new visualization, and then select the visualization type from the New Visualization screen. This screen presents various visualization types, as shown below:

Select visualization type

Choose the visualization option that best suits your data by clicking on the visualization type box. Here, we selected the Area chart visualization.

After selecting the visualization type, for most of the visualization types, the next step is to choose the desired index to work with. This will be the data source that the visualization will be built on. The visualization type selected will redirect you to the screen displayed below.

Choose a source

Wazuh dashboard aggregation

The Wazuh dashboard visualization contains two main aggregation objects:

  • Metrics aggregation.

  • Bucket aggregation.

Metric aggregation

Metric aggregation calculates metrics by aggregating data values. This contains the actual values of the metric to be calculated. Metric aggregation is typically represented on the Y-axis.

There are different types of metric aggregations as shown below:

  • Average: This is the average of a numeric field. It calculates the arithmetic mean of an existing set of data values. The average is obtained by adding up all the data values and dividing their sum by the total count.

    Average aggregation helps in calculating the average duration of security incidents, average severity score of alerts, average response time to resolve incidents, and more.

    Average metrics aggregation
  • Count: This is the number of data values that match a query within the selected index pattern. It counts the number of data points in a set and provides the total count of a queried event.

    Count aggregation helps determine the total number of security events, the number of alerts triggered by a specific rule, the number of failed login attempts, and more.

  • Max: This is the maximum value of a numeric field within a selected index pattern. Max identifies the highest value among a group of values.

    Max aggregation helps identify the maximum severity level of alerts, maximum CPU usage, and more.

    Max metrics aggregation
  • Median: This is the median value in a numeric field. Median determines the middle value in a sorted set of values within a selected index pattern by separating the higher half from the lower half of the data.

    Median aggregation helps to provide the middle value of event durations, helping to identify the typical or median response time.

  • Min: This is the minimum value in a numeric field set. Min identifies the lowest value among a group of values.

    Min aggregation helps determine the minimum severity level of alerts, minimum disk space usage, minimum number of successful logins, and more.

    Min metrics aggregation
  • Percentile Ranks: This is the ranking for values within a given numeric field in percentile. Percentile rank calculates the percentage of values below a specific value in a set and expresses how a given value compares to the distribution of the data.

    Percentile rank aggregation helps in assessing the relative severity of alerts in comparison to the entire dataset. This determines the percentile rank of a specific severity score.

  • Percentile: This aggregation changes numeric field values into percentile bands. Percentile identifies specific data values that correspond to specific percentiles. For example, the 90th percentile represents the value below which 90% of the data falls.

    Percentiles metrics aggregation
  • Standard Deviation: This measures the amount of variation in a set of numeric field values. It evaluates the average distance between each value and the mean value.

    Standard deviation aggregation can help identify changes in event durations. This provides insights into the volatility or stability of security events.

  • Sum: This is the total sum of a numeric field. Sum calculates the total sum of a set of values by adding up all the values in the dataset within a selected index pattern.

    Sum aggregation helps in determining the total count of specific event types, the total number of successful logins, the total disk space used, and more.

  • Top Hit: This aggregation identifies the top data point based on a specified criteria or sort order. Top hit is commonly used to extract specific information from the dataset based on the top metric.

    Top hit aggregation helps in extracting key information from security events, such as retrieving the most recent log entry for a particular host or user.

    Top Hit metrics aggregation
  • Unique Count: This is the count of unique values within a designated field. It counts the number of unique or distinct values in a set. Unique count disregards any duplicate event and provides the count of unique values.

    Unique count aggregation helps in determining the number of distinct IP addresses accessing a system, the number of unique users triggering alerts, the count of unique event types, and more.

Parent pipeline aggregations

This category of pipeline aggregations is able to compute new buckets based on other parent aggregations.

Parent pipelines aggregation
  • Cumulative Sum: This is the calculation of the running sum of a metric across a specified set of data points. It shows the progressive total as each data point is added. Cumulative sum aggregation can be used to track the total count of security events over time, providing insights into the cumulative impact of incidents.

  • Derivative: This is the calculation of the rate of change of values over time. Derivative is the difference between consecutive values in a time series or dataset. Derivative aggregation helps in calculating the rate of change in event counts or severity scores. This enables the detection of sudden spikes or anomalies.

  • Moving Avg: This is the calculation of the average of a metric over a moving window of data points. It provides a neat representation of the data, hence reducing noise or fluctuations. Moving average aggregation helps in smoothing out fluctuations in event counts or resource usage, enabling trend analysis or anomaly detection.

  • Serial Diff: This is the difference between consecutive values in a time series or ordered dataset. It measures the absolute change from one data point to the next. Serial diff aggregation helps in identifying the difference in event counts or resource usage between consecutive data points, showing changes or trends.

Sibling pipeline aggregations

This category of aggregations computes new aggregations which will be at the same level as the sibling aggregation from which its input was provided from.

Sibling pipeline aggregations
  • Average Bucket: This is the average value of a metric within each bucket of a specified aggregation. Average bucket provides the average value per group or category. Average bucket aggregation helps in calculating the average severity score or event count within specific time intervals or categories.

  • Max Bucket: This is the maximum value of a metric within each bucket of a specified aggregation. It identifies the highest value per group. Max bucket aggregation enables the identification of the maximum severity level or event count within specific time intervals or categories.

  • Min Bucket: This is the minimum value of a metric within each bucket of a specified aggregation. It identifies the lowest value per group or category. Min bucket aggregation helps identify the minimum severity level or event count within specific time intervals or categories.

  • Sum Bucket: This is the total sum of a metric within each bucket of a specified aggregation. It adds up the values per group. Sum bucket aggregation helps in calculating the total count or severity score within specific time intervals or categories.

Bucket aggregation

This is used to determine the type of information we are trying to get from the dataset. The bucket aggregation determines how the data is segmented or grouped such as by date. It is typically represented on the X-axis.

Bucket aggregation

The following are the types of bucket aggregations:

  • Date Histogram: This aggregation is used to display data organized by a date.

  • Date Range: This aggregation is used to report the values within a date range which we can specify.

  • Filters: This aggregation is used to apply filters on data.

  • Histogram: This aggregation is used for numeric fields, where we can provide the integer interval for the selected field.

  • IPv4 Range: This aggregation provides us with the option to set the range using IPv4 addresses.

  • Range: This aggregation is used to provide the range of numeric field values.

  • Significant Terms: This aggregation returns interesting or unusual occurrences of terms in a set.

  • Terms: This aggregation enables us to pick the top or bottom n elements of the selected field.

Both the Y-axis and the X-axis are used to plot the data points on a visualization chart.

Basic charts

The following is a list of the basic charts for visualization:

  • Bar, area, and line charts: These charts are used for comparing different series in x-axis and y-axis.

  • Pie charts: These charts are used when all of the fields are related to each other.

  • Heat maps: These are used to shade the cells within a matrix.

Bar charts

Bar charts are a type of visualization that is used to compare specific measures for different data categories. These are the most common types of visualization and are easy to create and interpret. Bar charts are used to present categorical data in the form of rectangular bars with heights/lengths that are proportional to the given values.

Creating a Bar chart

Horizontal Bar: This is a type of bar chart where rectangular bars are displayed horizontally. The length or width of each bar corresponds to a particular value. This allows an easy comparison between different data points. Horizontal bar charts are often used to visualize data that has distinct categories or to show rankings.

The steps below show how to create a horizontal bar visualization that shows varying numbers of MITRE tactics detected within a set timeframe.

  1. Click Create new visualization from the Visualize tab, select the Horizontal Bar visualization format and use wazuh-alerts-* as the index pattern name.

  2. Set the following value in the Data section, on the Y-axis, in Metrics:

    • Aggregation = Count

  3. Add a X-axis in Bucket and set the following values:

    • Aggregation = Terms

    • Field = rule.mitre.tactic

    • Order by = Metric: Count

    • Order = Descending

    • Size = 10

  4. Click the Update button.

    Create horizontal bar visualization – Update button
  5. Click the Save button in the top right corner and assign a title to save the visualization.

Vertical Bar: This is a type of bar chart where the bars are displayed vertically, with the length or height of each bar representing a particular value. Vertical bar charts are suitable for comparing data across different categories. They are commonly used to display rankings, comparisons, or the distribution of values.

The steps below detail how to create a vertical bar visualization that shows varying numbers of MITRE tactics detected within a set timeframe.

  1. Click Create new visualization from the Visualize tab, select the Vertical Bar visualization format and use wazuh-alerts-* as the index pattern name.

  2. Set the following value in the Data section, on the Y-axis, in Metrics:

    • Aggregation = Count

  3. Add a X-axis in Bucket and set the following values:

    • Aggregation = Terms

    • Field = rule.mitre.tactic

    • Order by = Metric: Count

    • Order = Descending

    • Size = 10

  4. Click the Update button.

    Create vertical bar visualization – Update button
  5. Click the Save button in the top right corner and assign a title to save the visualization.

Pie charts

This is a circular chart that is divided into sectors, with each sector representing a percentage of a whole data set. They are commonly used to show market share, composition of data, or distribution of categories. The total slice size of a pie chart is calculated by the metrics aggregation. In the case of a pie chart, we use the count, sum, and unique count.

The steps below show how to create a Pie chart visualization that shows MITRE tactics count within a timeframe.

Creating a Pie chart
  1. Click Create new visualization from the Visualize tab, select the Pie visualization format and use wazuh-alerts-* as the index pattern name.

  2. Set the following value in the Data section, on the Slice size, in Metrics:

    • Aggregation = Count

  3. Add a Split slices in Bucket and set the following values:

    • Aggregation = Terms

    • Field = rule.mitre.tactic

    • Order by = Metric: Count

    • Order = Descending

    • Size = 10

  4. Customize the Pie chart by toggling on show label in the Options section.

  5. Click the Update button.

    Create pie visualization – Update button
  6. Click the Save button in the top right corner and assign a title to save the visualization.

Area charts

This is used to display graphically quantitative data using filled-in areas. The areas between axes and lines are typically filled with colors or patterns to differentiate between different categories or data points. This emphasizes the quantity beneath a line chart. Area charts are useful for showing the magnitude and distribution of data over time or categories. They are often used to display trends, comparisons, or cumulative values.

The steps below show how to create an Area chart that visualizes a histogram of Wazuh rule levels and their maximum fired times.

Creating an Area chart
  1. Click Create new visualization from the Visualize tab, select the Area visualization format, and use wazuh-alerts-* as the index pattern name.

  2. Set the following value in the Data section, on the Y-axis, in Metrics:

    • Aggregation = Max

    • Field = rule.level

  3. Add another Y-axis in Metric and set the following values:

    • Aggregation = Max

    • Field = rule.firedtimes

  4. Add an X-axis in Bucket and set the following values:

    • Aggregation = Date Histogram

    • Field = timestamp

  5. Click the Update button.

    Create area visualization – Update button
  6. Click the Save button in the top right corner and assign a title to save the visualization.

Line charts

This visualization represents data points connected by straight lines. It is commonly used to display trends, patterns, relationships over time or a continuous range. By plotting data along a Cartesian coordinate system, lines are drawn to connect the data points. This provides a clear depiction of how the values change.

The steps below show how to create a Line chart that visualizes the Wazuh rule levels triggered maximum times within a timeframe.

Creating a Line chart
  1. Click Create new visualization from the Visualize tab, select the Line visualization format, and use wazuh-alerts-* as the index pattern name.

  2. Set the following value in the Data section, on the Y-axis, in Metrics:

    • Aggregation = Max

    • Field = rule.level

  3. Add an X-axis in Buckets and set the following values:

    • Aggregation = Date Histogram

    • Field = timestamp

    • Minimum interval = Minute

  4. Click the Update button.

    Create line visualization – Update button
  5. Click the Save button in the top right corner and assign a title to save the visualization.

Heat maps

This is a graphical representation that uses colors to visualize the density of certain variables. Heat maps display data points as colored cells, with each color representing a different value or level of intensity. Heat maps are useful for identifying patterns, trends, or variations within a dataset.

The steps below show how to create a Heat map that visualizes the mapping of MITRE tactics and techniques.

Creating a Heat Map
  1. Click Create new visualization from the Visualize tab, select the Heat Map visualization format, and use wazuh-alerts-* as the index pattern name.

  2. Set the following value in the Data section, on the Y-axis, in Metrics:

    • Aggregation = Count

  3. Add an X-axis in Buckets and set the following values:

    • Aggregation = Terms

    • Field = rule.mitre.tactic

    • Order by = Metric: Count

    • Order = Descending

    • Size = 5

  4. Add a Y-axis in Buckets and set the following values:

    • Aggregation = Terms

    • Field = rule.mitre.techniques

    • Order by = Metric: Count

    • Order = Descending

    • Size = 5

  5. Click the Update button.

    Create heat map visualization – Update button
  6. Click the Save button in the top right corner and assign a title to save the visualization.

Data

Data metric visualization is a single number that displays any count or calculation.

The following is a list of data visualizations:

  • Data table: This is where the data is shown in tabular form.

  • Metric: This is where a single number is displayed, which we can use to show any important metric data.

  • Goal and gauge: This is used when we want to display any progress.

Data table

This is a tabular representation of data that is organized into rows and columns. It provides a structured format to display and analyze data. Each row represents a specific entry, and each column represents a different variable. Data tables are widely used for data analysis, reporting, and providing a clear overview of multiple variables.

The following steps show how to create a Data table to visualize the maximum count of Wazuh rule levels that were triggered.

Creating a Data table
  1. Click Create new visualization from the Visualize tab, select the Data Table visualization format and use wazuh-alerts-* as the index pattern name.

  2. Set the following metrics in the Data section:

    • Aggregation = Max

    • Field = rule.level

  3. Add an additional metric

    • Aggregation = Max

    • Field = rule.firedtimes

  4. Click the Update button.

    Create data table visualization – Update button
  5. Click the Save button in the top right corner and assign a title to save the visualization.

Metric

This is a quantifiable measurement that is used to evaluate performance, progress, or specific characteristics. Metric represents a calculation as a single numerical value. They are applicable in various domains, including business analytics, key performance indicators (KPIs), and performance monitoring.

The following steps show how to create a Metric to visualize the maximum number of rule levels that triggered alerts.

Creating a Metric
  1. Click Create new visualization from the Visualize tab, select the Metric visualization format and use wazuh-alerts-* as the index pattern name.

  2. Set the following metrics in the Data section:

    • Aggregation = Max

    • Field = rule.level

  3. Click the Update button.

    Create metric visualization – Update button
  4. Click the Save button in the top right corner and assign a title to save the visualization.

Goal

This refers to the desired target that an individual or organization aims to achieve. It represents a specific purpose and serves as a benchmark for measuring progress and achieving a final goal. Goal visualization helps display progress toward a defined target, often represented as a percentage or count, making it easier to interpret key metrics at a glance.

The steps below show how to create Goals to visualize the Security Configuration Assessment (SCA) policy status in percentage and counts.

Creating a Goal
  1. Click Create new visualization from the Visualize tab, select the Goal visualization format and use wazuh-alerts-* as the index pattern name.

  2. Set the following metrics in the Data section:

    • Aggregation = Max

    • Field = data.sca.passed

  3. Add a Split group in Buckets and set the following values:

    • Aggregation = Terms

    • Field = data.sca.total_checks

  4. Customize the Ranges to match the range of existing SCA rules in the Options section. This ensures the visualization accurately reflects the scale of checks (e.g., from 0 to the maximum number of checks).

    Create goal visualization
  5. Click the Update button.

    Create goal visualization – Update button
  6. Click the Save button in the top right corner and assign a title to save the visualization.

Gauge

This is a visualization that is represented as a meter. It is commonly used to display a single value within a specific range. The gauge consists of a pointer that shows the current value. This is displayed as a position along a circular or linear scale. Gauges are used to indicate progress, performance metrics, or levels of achievement. It shows how a metric’s value relates to reference threshold values.

The steps below show how to create a Gauge to visualize the SCA failed counts.

Creating a Gauge
  1. Click Create new visualization from the Visualize tab, select the Gauge visualization format, and use wazuh-alerts-* as the index pattern name.

  2. Set the following metrics in the Data section:

    • Aggregation = unique_count

    • Field = data.sca.failed

  3. Click the Update button.

    Create gauge visualization – Update button
  4. Click the Save button in the top right corner and assign a title to save the visualization.

Maps

These are visual representations of geographical regions. Maps display spatial data, such as locations, boundaries, or distributions, on a graphical interface. They provide a means to explore and analyze geographic information, making them valuable for various applications, including navigation, data visualization, and spatial analysis.

The steps below show how to create a geographic map.

Creating a map

  1. Click Create new visualization from the Visualize tab, select the Maps visualization format.

    Create map visualization
  2. Click on Add layer.

    Create map visualization – Add layer
  3. Select Documents as the Data layer.

  4. Set the following values in the New layer:

    • Data source = wazuh-alerts-*

    • Geospatial field = GeoLocation.location

    • Number of documents = 1000

    Create map visualization – New layer
  5. Click the Update button.

    Create map visualization – Update button
  6. Click the Save button in the top right corner and assign a title to save the visualization.

The following is a list of maps used in visualization:

  • Coordinate map: This can be used for linking the aggregation of data fields with geographic locations.

  • Region map: This is a kind of thematic map where we use color intensity to show a metric's value with locations.

Coordinate Map

This uses geographic coordinates to display data points or regions on a map. Coordinate maps allow you to plot and visualize information in relation to specific locations or geographical areas. By using latitude and longitude coordinates, you can represent data in a spatial context.

Coordinate maps are ideal for plotting latitude and longitude coordinates. This allows the visualization of spatial data, such as locations, regions, or density. They are commonly used in geographical analysis, tracking data by location, or displaying demographic information.

The steps below show how to create a coordinate map based on the origin location.

Creating a Coordinate map
  1. Click Create new visualization from the Visualize tab, select the Coordinate Map visualization format, and use wazuh-alerts-* as the index pattern name.

    Create coordinate map visualization
  2. Set the following values on the Metric in Data:

    • Aggregation = Count

  3. Add a Geo coordinate in Buckets and set the following values:

    • Aggregation = Geohash

    • Field = GeoLocation.location

  4. Click the Update button.

    Create coordinate map visualization – Update button
  5. Click the Save button in the top right corner and assign a title to save the visualization.

Region Map

This is a map-based visualization that displays data by dividing regions into distinct boundaries. Region maps are suitable for displaying data at a territorial level. They are often used in geopolitical analysis, demographic comparisons, or election results.

The steps below show how to create a region map based on the destination country.

Create region map
  1. Click Create new visualization from the Visualize tab, select the Region Map visualization format and use wazuh-alerts-* as the index pattern name.

    Create region map visualization
  2. Set the following values on the Metric in Data:

    • Aggregation = Count

  3. Add a Shape field in Buckets and set the following values:

    • Aggregation = Terms

    • Field = GeoLocation.country_name

    • Order by = Metric: Count

    • Order = Descending

  4. Select Name as Join field under the Layer Options tab.

  5. Click the Update button.

    Create region map visualization – Update button
  6. Click the Save button in the top right corner and assign a title to save the visualization.

Time series

The following is a list of time series used in visualization:

  • VisBuilder: This is used to display the results from single or multiple indices by combining data from multiple time series datasets.

  • Time series visual builder: This is used to visualize time series data using data aggregations.

VisBuilder

Visualization Builder is an intuitive tool that allows users to create customized visualizations without programming knowledge. It is beneficial for users who want to quickly generate visual representations of their data without extensive technical knowledge.

As of the time of writing this document, this visualization is experimental. The design and implementation are less mature than stable visualizations and might be subject to change.

The steps below show how to use Visualization Builder to present MITRE technique and tactics.

Creating a Visualization Builder
  1. Click Create new visualization from the Visualize tab, select the VisBuilder visualization format and use wazuh-alerts-* as the index pattern name.

    Create VisBuilder visualization
  2. Drag a field to the configuration panel to generate a visualization.

  3. Set aggregation to count on the Y-axis.

  4. Set rule.mitre.technique on an X-axis.

  5. Set rule.mitre.tactics on the split series.

    Create VisBuilder visualization – Data
  6. Click the Save button in the top right corner and assign a title to save the visualization.

TSVB

Time Series Visual Builder (TSVB) is a component of the Wazuh dashboard that allows users to create visualizations and analyze time series data using a visual pipeline interface. It provides features such as aggregations, filters, and metrics specifically tailored for time-based analysis.

The steps below show how to use Time Series Visual Builder to visualize MITRE tactics count within a timeframe.

Creating a TSVB
  1. Select the TSVB visualization format from the Visualize tab.

    Create TSVB visualization
  2. Set the following values on the Metric in Data:

    • Aggregation = Count

    • Group by = Terms

    • By = rule.mitre.tactic

    • Top = 10

    • Order by = Doc Count (default)

    • Direction = Descending

    Create TSVB visualization – Data
  3. Click the Save button in the top right corner and assign a title to save the visualization.

Others

Here are some other items that are used in visualization:

  • Tag cloud: This is where selected field values are picked for creating a cloud of words.

  • Markdown: This will display a form for showing information or instructions.

Tag Cloud

This is a visual representation of text data where words are displayed in varying sizes based on their importance. Tag clouds are often used in data visualization, text analysis, or content analysis.

Creating a tag cloud
  1. Click Create new visualization from the Visualize tab, select the Tag cloud visualization format, and use wazuh-alerts-* as the index pattern name.

    Create tag cloud visualization
  2. Set the following value on the Metric in Metrics data:

    • Tag size = Count

  3. Add a new Tag in Bucket data and set the following values:

    • Aggregation = Terms

    • Field = rule.mitre.tactic

    • Order by = Metric: Count

  4. Click the Update button.

    Create tag cloud visualization – Update button
  5. Click the Save button in the top right corner and assign a title to save the visualization.

Markdown

Markdown is a lightweight markup language that is used for formatting text. It allows users to add structure, emphasis, and styling to plain text documents, without the need for complex coding. Markdown is often utilized in documentation, websites, and note-taking applications to create easily readable and formatted content.

Creating a markdown
  1. Click Create new visualization from the Visualize tab, select the Markdown visualization format, and use wazuh-alerts-* as the index pattern name.

    Create markdown visualization
  2. Add the text content in the given text-area on the Data tab.

  3. Increase or decrease the font using the controller on the Options tab.

  4. Click on the Update button to show the markdown:

    Create markdown visualization – Update button
  5. Click the Save button in the top right corner and assign a title to save the visualization.

Controls

These are interactive tools that provide users with the ability to manipulate or adjust parameters or settings within a software application or user interface. These controls enable users to customize their experience or modify certain aspects of the system according to their preferences. Controls are typically used in interactive applications or interfaces where users need to adjust settings, parameters, or filters to customize their experience or analyze specific aspects of the data.

As at the time of writing this document, this visualization is experimental. The design and implementation are less mature than stable visualizations and might be subject to change.

Creating controls
  1. Click Create new visualization from the Visualize tab, select the Controls visualization format.

    Create controls visualization
  2. Add a new Options list and set the control Label as MITRE tactic.

  3. Choose a source for the chart. Here we selected wazuh-alerts-* as the index to use.

  4. Select the field rule.mitre.tactic.

    Select field ``rule.mitre.tactic``
  5. Add a new Range slider and set the control Label as Quantity.

  6. Select wazuh-alerts-* as the index to use.

  7. Select rule.level as the Field.

  8. Click the Update button.

    Create controls visualization – Update button
  9. Click the upper-right Save button and assign a title to save the visualization.

Gantt Chart

This is a visualization that is used to illustrate project schedules or timelines. It displays a horizontal bar for each task or activity, representing its start and end dates. The length of the bars indicates the duration of each task, and they are arranged along a timeline to demonstrate the order and duration of various project activities.

Gantt charts are valuable for project management or scheduling tasks over time. They help in visualizing project timelines, dependencies, and resource allocation.

Creating a Gantt chart
  1. Click Create new visualization from the Visualize tab, select the Gantt Chart visualization format and use wazuh-alerts-* as the index pattern name.

    Create Gantt chart visualization
  2. Select a log data on the Metric in Metrics data, under Event.

  3. Select a timestamp field for the start of a schedule on the Start time field for the Event. This is the timestamp used for the beginning of the selected Event.

  4. Select a time interval field for the Event duration on the Duration field for the Event. This is the amount of time that is added to the start time.

  5. Select the number of events that will be shown on the chart on the Results field. The events will be sequenced based on the Start time, from the earliest to the latest.

  6. Navigate to the Panel settings to adjust the colors, axis labels and time format.

  7. Click the Update button.

  8. Click the upper-right Save button and assign a title to save the visualization.

Hover over a bar to see the duration of that event.

Timeline

This is a chronological display of events or activities, often depicted as a horizontal line with dates or time periods marked along it. Timeline builds time-series using functional expressions.

They are commonly used in historical analysis, project planning, or storytelling.

Creating Timeline
  1. Click Create new visualization from the Visualize tab, and select the Timeline visualization format.

    Create timeline visualization
  2. Choose a source for the chart. In the Timeline expression windows, within .opensearch(*). The expression .opensearch(*) is a wildcard value that represents all the indexes currently within the Wazuh indexer, combined together. Here we selected wazuh-alerts-* as the index to use.

    .opensearch(index=wazuh-alerts-*)
    
    Create timeline visualization – Source

    Where:

    • Index represents the data storage unit containing the data to be used for visualization.

    • Interval represents the time duration between data points or events.

    • Timefield represents a specific field in a dataset that holds timestamp or time information for each data point.

    • Metric represents the quantitative measure to be used from the data.

    • Offset is used to adjust the time displayed on the timeline for aligning with specific events.

    • opensearchDashboards represents a platform that provides a web-based interface for visualizing and exploring real-time data.

    • Q represents a query or set of queries used to filter and retrieve specific data for display.

    • Split represents the function that divides or groups data into segments based on a specified parameter for visualization and analysis.

    A sample query:

    .opensearch(index=wazuh-alerts-*, timefield=@timestamp, metric=count:request).aggregate(function=avg)
    

Vega

This is a versatile declarative language for creating interactive visualizations. It allows users to define visualizations using JSON syntax. It allows users to define complex visualizations using JSON syntax and is suitable for advanced data visualization needs.

Creating a dashboard

Dashboards transform your data from one or more single visualization perspectives into a group of visualizations that provide a clear representation of your data. This allows you to concentrate solely on the data that matters to you by presenting a dynamic representation of your data.

To create a custom dashboard, do the following:

  1. Click on the upper-left menu icon and navigate to Explore > Dashboards > Create new dashboard.

    Create new dashboard
  2. Click Add an existing and select the newly created visualizations to populate the dashboard.

    Create new dashboard – Add visualizations
  3. Save the dashboard by selecting the Save option on the top-right navigation bar.

    Create new dashboard – Save