gcp-pubsub

New in version 3.13.0.

This configuration section is used to configure the Google Cloud Pub/Sub module.

Options

Main options

Scheduling options

enabled

This indicates if the module is enabled or disabled.

Default value

n/a

Allowed values

yes, no

project_id

This tag indicates the Google Cloud project ID.

Default value

n/a

Allowed values

Any string indicating the project ID

For example <project_id>wazuh-dev</project_id>.

subscription_name

This string specifies the name of the subscription to read from.

Default value

n/a

Allowed values

Any string

For example <subscription_name>wazuh-name</subscription_name>.

credentials_file

This setting specifies the path to the Google Cloud credentials file in JW Tokens. Allows both relative (to $HOME_INSTALLATION) and absolute paths.

Default value

n/a

Allowed values

Any path to a credentials file

For example <credentials_file>wodles/gcp-pubsub/credentials.json</credentials_file>.

max_messages

Number of maximum messages pulled in each iteration.

Default value

100

Allowed values

Any integer

logging

Toggle between the different logging levels.

Default value

info

Allowed values

disabled/info/debug/warning/error/critical

pull_on_start

Trigger the pulling in case of an agent start or restart.

Default value

yes

Allowed values

yes, no

interval

Interval between module executions.

Default value

1h

Allowed values

A positive number that should contain a suffix character indicating a time unit, such as, s (seconds), m (minutes), h (hours), d (days), w (weeks), M (months)

day

Day of the month to run the fetch logs from GCP.

Default value

n/a

Allowed values

Day of the month [1..31]

Note

When the day option is set, the interval value must be a multiple of months. By default, the interval is set to a month.

wday

Day of the week to run the script to fetch logs. This option is not compatible with the day option.

Default value

n/a

Allowed values

Day of the week:
  • sunday/sun

  • monday/mon

  • tuesday/tue

  • wednesday/wed

  • thursday/thu

  • friday/fri

  • saturday/sat

Note

When the wday option is set, the interval value must be a multiple of weeks. By default, the interval is set to a week.

time

Time of the day to retrieve logs from GCP. It has to be represented in the format hh:mm. This option is compatible with day or wday options.

Default value

n/a

Allowed values

Time of day [hh:mm]

Note

When only the time option is set, the interval value must be a multiple of days or weeks. By default, the interval is set to a day.

Configuration example

Linux configuration:

<gcp-pubsub>
    <pull_on_start>yes</pull_on_start>
    <interval>1m</interval>
    <project_id>wazuh-dev</project_id>
    <subscription_name>wazuhdns</subscription_name>
    <logging>debug</logging>
    <credentials_file>wodles/gcp-pubsub/credentials.json</credentials_file>
</gcp-pubsub>